opyebCloudCostCal

Gemini doubles on 1 December: what the change costs at your volume

Google's own pricing page says the current rate runs “through November 30, 2026”. Three days after this page was written, the same tokens cost twice as much.

2026-11-28 · OPYEB

This is not a rumour or a leak. The Gemini API pricing page carries the dates in the price cell: Gemini 4 Carbon and Gemini 4 Argon are billed at $2.00 input and $10.00 output per million tokens through 30 November 2026, and at $4.00 and $20.00 from 1 December 2026. Context caching moves from $0.10 to $0.20 per million tokens. A second change is already scheduled: Gemini 3.8 Flash and 3.6 Flash go from $0.75 / $3.75 to $1.50 / $7.50 on 1 January 2027.

Most cost estimates in circulation use today's number. If your budget, your pricing page or your investor deck was built in November, it is about to be wrong by 100% on the input side and 100% on the output side.

The bill at a normal workload

One million requests a month, 1,200 input and 400 output tokens each, no caching. That is 1.2 billion input tokens and 400 million output tokens per month.

ModelUntil 2026-11-30From 2026-12-01Increase
Gemini 4 Carbon$6,400$12,800+$6,400
Gemini 4 Argon$6,400$12,800+$6,400
Gemini 3.8 Flash (from 2027-01-01)$2,400$4,800+$2,400

The arithmetic is the same line the calculator runs: cost = requests × (input × price_in + output × price_out) ÷ 1,000,000. One million requests at 1,200 tokens is 1,200 million tokens, so $2.00 per million becomes $2,400 of input; 400 million output tokens at $10.00 is $4,000. Total $6,400, and $12,800 after the change.

Three ways to absorb it, in order of effort

  1. Cache what repeats. A cache read is 5% of the base input price on these models ($0.20 against $4.00). At a 60% hit rate the same workload costs $10,064 instead of $12,800. Nothing in the product changes.
  2. Move the batch jobs. Anything that can wait until tomorrow is 50% cheaper on every major provider. Batch is already the cheapest lever and the price change does not touch it.
  3. Change the model, not the provider. Gemini 4 Hydrogen stays at $1.50 / $7.50 and Gemini 3.8 Flash at $0.75 / $3.75 until January. If 80% of your traffic is classification, extraction or summarisation, that traffic rarely needs Carbon.
Rule of thumb: a 2× list-price increase is survivable with caching and routing; a 2× increase you did not plan for is a 2× increase in your burn.

What to do this week

Re-run your own numbers with the post-December rates (the calculator flags the change next to each model), then look at two ratios before you renegotiate anything: the share of input tokens that repeat across requests, and the share of requests that could wait a day. Those two percentages decide whether the change costs you 100% or 20%.

Put your workload into the calculator · See the rate table with the change flagged

Guides →
Rate library About Contact